All questions regarding the project can be asked in direct instagram (@ta6urkin) or by e-mail
Steel Sheet Metal Drawings Plans Pattern Template Fire Pit 2 Project Sculpture (dxf, PDF)
Monumental and simple firepit. Of all the firepits that I have ever designed, on my own behalf or for someone else, I would choose this one for myself. This project does not save material, so you are unlikely to make it from stainless steel, rather ordinary structural steel and heat-resistant paint.
The project involves 6 mm steel. The total weight of the assembly is 130 kg. I will try to make the following projects less massive. Overall dimensions are 706x700x350. A welded bottom for falling coal and ash is provided under the sheet metal grate, the distance between the petals is 29mm. There is also a second version of firepit, which is also included in the project, it has through holes.
This digital product is not for distribution (dxf, PDF), it is intended for you and your production.
Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.
Thank you and good luck with your work!























