All questions regarding the project can be asked in direct instagram (@ta6urkin) or by e-mail
Steel Sheet Metal Drawings Plans Pattern Template Chess Horse Project Sculpture (dxf, PDF)
Horse head sculpture involves the manufacture of steel with a thickness of 1.5 mm and a bending radius of 1 mm. The minimum bending angle is 10 degrees, the maximum angle is 90 degrees. The weight of the sculpture is about 14kg. There are 40 details in total. The design documentation includes 29 pages, 27 of which are bending drawings. The instruction includes 14 pages in the order of assembly. There are mirror parts in the assembly and have an index (_01) and their bending must be performed in the other direction. The bend line is drawn along the cutouts in the part, in accordance with the drawing. The archive includes: dxf (27 pcs.- files separately), Drawings (29 pages), Instructions (14 pages).
There is no engraving on the dxf, bending is performed along the line indicated by drop-shaped cutouts at the ends of the bending line.
If you need to create a stencil for printing in PDF format or create a DXF file with all the parts located on the sheet metal format you need, please contact me.
This digital product is not for distribution (dxf, PDF), it is intended for you and your production.
Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.
Thank you and good luck with your work!


























